Atlantis Maintenance Completed
Date: 24 Jul 2011
Insight Marine were pleased to play their part in the successful recovery and subsequent deployment of Atlantis Resources' AR1000 tidal turbine at the EMEC test site, Orkney, this summer.
Short notice mobilisation of a survey spread to the AHTS Olympic Zeus provided surface and subsea feedback for the onboard ROV team and vessel DP crew to carry out the delicate extraction process of the device from its gravity base.

Mojo Maritime Ltd provided marine operations support during the recovery, Insight Marine's provision of survey equipment and personnel contributed to completion of the project in record time.
Insight Marine Projects were again contracted a week later to provide equipment and personnel during re-deployment of the device after dockside repairs had been completed in Kirkwall, Orkney.

Deployment was carried out using the OCV Boa Deep C and her onboard ROV spread. Again mobilisation was requested at short notice, something which Insight was able to respond to within the tight timeframe.
The single rotor AR1000, three blade tidal turbine can produce up to 1 MW of power at water velocity of 2.65 m/s. The tidal turbine's rotor diameter is 18 m, and it stands 22.5 m tall. Total weight is 1500 tonnes.
Insight Orders Scout Plus USBL
Insight Marine Projects are pleased to announce the recent purchase of Sonardyne's Scout Plus USBL (Ultra-Short BaseLine) subsea acoustic positioning system More...
Two South West companies involved with EMEC operations
Precise, efficient, reliable – Insight Marine Projects Ltd is continuing to provide professional, tailored support to the marine renewables industry in challenging environments More...
Insight Positions Bauer for Success
Insight Marine Projects are proud to announce the successful installation of a drilled-in monopile foundation at the EMEC tidal test site, Orkney by Bauer Renewables Ltd More...
Case Study: SeaGen Installation - Surface Positioning Marine Current Turbines Ltd (MCT) recently completed work in Strangford Lough (Northern Ireland) on the installation of its 1.2MW SeaGen tidal system. Insight Marine were contracted to provide surface positioning to the crane barge 'Missing Link' during topside installation and remedial piling. Meteorological conditions were also monitored and logged for daily analysis. More... |
Recently viewed |
|




